CLIENT: Built


DESCRIPTION: Construction of new 900 diameter stormwater trunk line including connection into existing heritage Oviform. The works included excavation of 8 metre deep trenches, custom shoring, service diversions and construction of all manholes. The works was staged in accordance with requirements of both Transport for NSW and Sydney City Council.

CLIENT: Mainbrace Constructions


DESCRIPTION: Installation and commissioning of stormwater retention and treatment farm. The installation included 3 x 110,000litre water storage tanks 1 x 90,000 litre spillceptor and all associated pipe & pit network. The commissioning included the installation of all pumps, control panels and associated adjustment to ensure all worked as designed.

CLIENT: Sydney Water 


DESCRIPTION: Replacement of the existing brick oviform with a GRP oviform, including encasement and suspension over 18 meters in length, elevated through the new hotel basement. 

CLIENT: JQZ Group


DESCRIPTION: Stormwater drainage solutions for roadworks.

CLIENT: Rainbow Group


DESCRIPTION: Stormwater detention tanks.

CLIENT: Ford Civil Contracting


DESCRIPTION: Stormwater pipework and in-situ concrete pits.

CLIENT: Ford Civil Contracting 


DESCRIPTION: Stormwater pre-packaged pump station.